I had a bathtub installed. I previously had the original tub and tile walls from when the house was built in the 60s, the drywall was completely rotted out behind the tile walls, and there was plumbing that needed to be replaced as well. Trevor was the installer. I know this project was quite tasking and took longer than expected. I seldom saw him take a break, and he stayed late on the last day to complete the job and clean up. I’m very happy with the finished product. Amazing job, Trevor!